From: route@monster.com
Sent: Friday, April 08, 2016 12:08 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: p6 PMP
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
MUTAZ B. MUHAMMAD SAID 11910 E KANSAS DR. Apt # 10 E, Aurora CO 80012 Mobile: (720) 800-5601 Email: mutazsaid@yahoo.com OBJECTIVES · Seeking for Quality Control Manager position with a
company which will require me to utilize my skills, abilities and experience
in the construction field to ensure the company's success. · To work in pragmatic way in an organization where I can
show my talent and enhance my skills to meet company goals and objective with
full integrity and zest. · Seeking for full time job. SUMMARY · Develops and maintains customer relationships to enhance
company's ability to procure projects, reduce risk, and ensure operational
efficiency. · Ability to effectively manage multiple projects and tasks,
with an emphasis on thoroughness, attention to detail, and organizational
skills. · Manages and coordinates Quality activities associated with
field engineering field procurement, construction, testing, and commissioning
within the Project scope. · Conducted daily inspections
to ensure construction followed design requirements and created detailed
design drawings for structures, buildings and systems added by the
modifications. · Demonstrate management know-how, leadership, and
interpersonal skills. · Knowledgeable of safety and relevant OSHA requirements and
regulations. PROFESSIONAL EXPERIENCE Al Saraf Group
LLC Quality Control Manager (Bayad Al Sard Co.)
March 2012 – March 2014 MTC Project – Military Training Compound Phase ll / Baghdad, Iraq ($24
million project) The project contained 7 multi-story buildings (new construction)
including the water network, electrical network, sanitary network, sewer
network, communication network, rods, parking areas, curbs and landscaping. · Performed the quality control system according to the QC
plan, utilized the submittal register log, three phase inspections process
for each DFW (definable feature of work), daily reports, check lists,
meetings, RFI (request for information), RFP (request for proposal) and
monthly invoices. · Responsible for the QCS (quality control system) database
software which is collecting the entire project's information regarding the
quality, safety, pay activities and government correspondence. · Performed detailed cost estimates and peer data reviews
for both design-build and bid-build government contracting projects. · Wrote and edited technical proposal sections, including
creation of Primavera schedules for more than 30 WBS and 1200 activities
according to NAS (network analysis system). · Worked with and provided technical support with company
Estimators and Project Managers. · Reviewed project specifications according to ASTM, CSI
format 2004, ACI, IBC, IPC standards. · The client was USACE (United State Army Corps of
Engineers). Quality Control Manager & Project Scheduler
September 2010 – January
2012 Qasr Amj Project / Al Anbar, Iraq ($7 million project) The project contained more than 20 buildings (renovation & new
construction) including water network, sewer network, electrical generators,
water well and rods. · Performed the quality control system according to the QC
plan, utilized the submittal register log, three phase inspections process
for each DFW (definable feature of work), daily reports, check lists,
meetings, RFI (request for information), RFP (request for proposal) and
monthly invoices. · Responsible for the QCS (quality control system) database
software collecting the entire project's information regarding the quality,
safety, pay activities and government correspondence. · Responsible for the updating schedule using Primavera 6.0
and monthly payments. · Conducting construction observation, field quality
assurance testing, site grading & construction. · Dealing with Military clients and Government departments
and maintaining excellent working relationships. · Controlling the Budget, H&S, QA/QC, Client
relationship, Program, Change orders and leading Value Engineering. · The client was USACE (United State Army Corps of
Engineers). ECC
International, LLC Alternative Quality Control
Manager
October 2009 – March 2010 Construction of Forward Operation Base Kandak, Tombstone / Helmand,
Afghanistan ($12 million project) The project contained 18 k-span buildings (new construction) including
water network, sewer network, sanitary network, water well, roads and
landscaping. · Conducting construction observation, field quality
assurance testing, site grading & construction. · Supervise the civil activities, earth work, concrete work,
K-Span construction, electrical work and Sewer-water network. · Performed three phase inspection process for all the
activities. ·
Follow up
of the construction program and implementing QA/QC procedures. ·
Preparing
site inspection requests and coordinating with the consultant through
checklist. ·
Follow up
of sub contractors activities and clarifying the technical matters. · Preparing daily, weekly and monthly reports. · The client was AFCEE (Air Force Center for Engineering and
the Environment). Quality Control
Engineer
February 2009 – July 2009 Director General for Intelligence & Security (DGIS) / Baghdad, Iraq ($45 million project) The project contained 6 k-span buildings multi story (new
construction) including water network, sewer network, sanitary network, water
well, roads and landscaping. ·
Supervision
of the site activities including structural and architectural works. ·
Follow up
of the construction program and implementing QA/QC procedures. ·
Assigning
labors and preparing wages according to the cost codes. ·
Preparing
site inspection requests and coordinating with the consultant through
checklist. ·
The client
was USACE (United State Army Corps of Engineers). Alternative Quality Control
Manager
May 2008 – January 2009 New Iraqi Army
Regional Commando Battalion Project / Al Asad
Air Base, Iraq ($18 million project) The project
contained 20 k-span buildings including water network, sewer network,
electrical network, helicopter pads, roads and landscaping. · Supervising all aspects of quality control including: site
work, power generation, electrical distribution, concrete placement, CMU
block construction, water treatment, water distribution, waste water
collection, helicopter pad construction, K-span erection and finishing. ·
This
project was recently identified by US Government auditors as having the “best
QC program in Iraq”. · Implemented a comprehensive 4 phase inspection process
leading to significantly less re-work than other similar company projects. · The client was AFCEE (Air Force Center for Engineering and
the Environment). Alternative Quality Control Manager
February 2007 – April 2008 CONSTRUCT
FACILITIES TO SUPPORT HQ 1/7 (HQ, 1st BRIGADE, 7th DIVISION) Project / Ramadi Base, Iraq ($100 million project) The project
contained three Forward Operation Bases (FOB) and each FOB contained more
than 15 buildings. The client was Air Force Center for Engineering and the
Environment (AFCEE). · Supervising all aspects of quality control, including:
site work, power generation, electrical distribution, concrete placement, CMU
block construction, water treatment, water distribution, waste water collection,
and ROWPU Units. · Responsible for daily reports, tracking submittal register
log, conducting weekly meetings, 3-phase inspections, and supporting the
H&S program for the site. WADI SAWA
Company Field
Engineer
November 2006 –
January 2007 Habbaniyah
Base Project / Al Anbar, Iraq The project
contained a fuel station, one building, and a security fence. The client was
Air Force Center for Engineering and the Environment (AFCEE). ·
Monitor
project documentation, including records, photographs and log books. ·
Maintain a
relationship with Client representatives, and consult if there are any
questions about the interpretation of plans and/or specifications. ·
Supervising
civil activities including concrete pouring, CMU works, survey work and
testing materials. ACADEMIC
EXPERIENCE · Al Mustansiriya University, Bachelor of Civil Engineering2005-2006 |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||
|
|